A badass blog

Prepping for Driftwater 7

Just a few more loose ends and the car will be ready to roll.
The to do list for tonight:
Install RUCAS
Add water for cooling system
Check valve for brake booster
Battery box install
Power steering rack and lines

Not too bad, so that’s the plan for tonight.

Reply

You must be logged in to post a comment.